Completed Projects:

Tiger Creek Generation Facility

Tiger Creek Generation Facility

Project Description. Approximately 128,000 square feet of surfaces was coated following preparation to SSPC-SP6 commercial Blast Cleaning and SSPC-SP3 Power Tool cleaning.

Surfaces received Corrosion Protection:

  • Bolted Connection and Surfaces of Field Welds-Zinc Inhibiting Epoxy

  • Stacks - Silicon Aluminum Coating

  • Structural Steel and Equipment - Acrylic Latex

Work Performed:

  • Coatings: Exhaust Stocks, Turbine Enclosures, Air Filtration Systems

  • Painting: Equipment, Piping, Structural Steel

  • Architectural Finishes, Painting: Equipment, Piping, Structural Steel,
    Floor Coatings and Sealers, Caulking and Sealants, and Decorative Finishes

Our Work. Our Results. Your Confidence.

At Ultimate Corrosion Control, we measure our success by the results we deliver. From power plants and chemical facilities to water treatment systems and industrial infrastructure, our completed projects showcase the proven performance of our coatings and corrosion control solutions.

Contact us at 248-388-3525 for more information or to request a detailed project quotation.

Completed Projects Index

  • Waste Water Treatment - FGD System
  • Tiger Creek Generation Facility
  • Mesquite Power Generation Facility
  • Trimble County Generation Facility
  • Electro-Coat Paint Tank Reline
  • E-Coat Secondary Containment

When your critical process equipment needs quick protection from corrosion – call the experts.