Completed Projects:
Mesquite Power Generation Facility
Mesquite Power Generation Facility
Project Description. Several different surfaces of concrete Secondary Containments received flexible, Corrosion Resistant linings to bridge potential movement of concrete and provide Corrosion Barrier to aggressive chemicals such as; Concentrated Sulfuric Acid and Caustic.
Work Performed.
Concrete Process Tanks and Sumps:
Surface preparation- SSPC-SP-13 (NACE6) - abrasive cleaning
Lining: 1/8 “ thick, fiberglass Mat reinforced Vinyl Ester Lining Systems
Secondary Containments:
Surface preparation- SSPC-SP-13 (NACE6) - abrasive cleaning
Lining: high performance, crack-bridging elastomeric lining system
Process Floors:
100% Solids High builds Epoxy, self leveling/ broadcast flooring Systems
Our Work. Our Results. Your Confidence.
At Ultimate Corrosion Control, we measure our success by the results we deliver. From power plants and chemical facilities to water treatment systems and industrial infrastructure, our completed projects showcase the proven performance of our coatings and corrosion control solutions.
Contact us at 248-388-3525 for more information or to request a detailed project quotation.
Completed Projects Index
- Waste Water Treatment - FGD System
- Tiger Creek Generation Facility
- Mesquite Power Generation Facility
- Trimble County Generation Facility
- Electro-Coat Paint Tank Reline
- E-Coat Secondary Containment