Completed Projects

Customer-Focused

Every project tells a story of protection, performance, and reliability. UCC has partnered with clients across industries to solve complex corrosion challenges, extend equipment life, and keep critical operations running strong.

Our Work. Our Results. Your Confidence.

At Ultimate Corrosion Control, we measure our success by the results we deliver. From power plants and chemical facilities to water treatment systems and industrial infrastructure, our completed projects showcase the proven performance of our coatings and corrosion control solutions.

Contact us at 248-388-3525 for more information or to request a detailed project quotation.

Completed Projects Index

  • Waste Water Treatment – FGD System
  • Tiger Creek Generation Facility
  • Mesquite Power Generation Facility
  • Trimble County Generation Facility
  • Electro-Coat Paint Tank Reline
  • E-Coat Secondary Containment

Waste Water Treatment Facilities

Waste Water Treatment Facility for FGD System
UCC as a single-source contractor, completed the application of corrosion control to all surfaces at this FGD Water Treatment Facility, providing a cost effective installation. More details >

Power Generation Facilities

Tiger Creek Generation Facility
Approximately 128,000 square feet of surfaces was coated following preparation to SSPC-SP6 commercial Blast Cleaning and SSPC-SP3 Power Tool cleaning. More details >

Mesquite Power Generation Facility
Several different surfaces of concrete Secondary Containments received flexible, Corrosion-Resistant linings to bridge potential movement of concrete. More details >

Trimble County CT5-CT10 Generation Facility
Approximately 180,000 square feet of surfaces was coated following preparation to SSPC-SP6 Commercial Blast Cleaning and SSPC-SP3 Power Tool Cleaning. More details >

Electro-Coating Facilities

Electro-Coat Paint Tank Reline Project
The old lining material and E Coat material was removed from main dip tank, weir tank and pump wells by high pressure water jetting with 36,000 PSI to clean the steel surfaces to bare metal. More details >

Secondary Containment Structure Under E-Coat Process Line – Prior to surface preparation all surfaces were evaluated based on Tensile Strength, Moisture Content, Surface Temperature, including Chloride and Sulfate Ion Contamination.
More details >

Our Work. Our Results. Your Confidence.

At Ultimate Corrosion Control, we measure our success by the results we deliver. From power plants and chemical facilities to water treatment systems and industrial infrastructure, our completed projects showcase the proven performance of our coatings and corrosion control solutions.

Contact us at 248-388-3525 for more information or to request a detailed project quotation.

Completed Projects Index

  • Waste Water Treatment – FGD System
  • Tiger Creek Generation Facility
  • Mesquite Power Generation Facility
  • Trimble County Generation Facility
  • Electro-Coat Paint Tank Reline
  • E-Coat Secondary Containment

Proven Results. Trusted Performance.
UCC’s completed projects demonstrate our expertise across industries — from power generation to chemical processing and containment restoration.