TRIMBLE COUNTY CT5-CT10 GENERATION FACILITY

Completed Projects

The following project is illustrative of work performed by Ultimate Corrosion Control for our diverse client base worldwide.

Project Index

> Waste Water Treatment - FGD System
> Tiger Creek Generation Facility
> Mesquite Power Generation Facility
>
Trimble County Generation Facility
> Electro-Coat Paint Tank Reline
> E-Coat Secondary Containment

Trimble County CT5-CT10 Generation Facility

Project Description. Approximately 180,000 square feet of surfaces was coated following preparation to SSPC-SP6 Commercial Blast Cleaning and SSPC-SP3 Power Tool Cleaning.
Surfaces received Corrosion Protection:

  • Bolted Connection and Surfaces of Field Welds- Zinc Inhibiting Epoxy

  • Piping and Pipe Supports- DTM Urethane Mastic

  • Diffusers- Silicon Aluminum Coating

  • Stacks, Structural Steel and Equipment- Acrylic Latex

Work Performed.

  • Coatings: Exhaust Stocks, Turbine Enclosures, Air Filtration Systems

  • Painting: Equipment, Piping, Structural Steel

  • Architectural Finishes, Painting: Equipment, Piping, Structural Steel,
    Floor Coatings and Sealers, Caulking and Sealants, and Decorative Finishes.

 

IN THE NEWS

Blome Tiles

Blome International Vitrified Tiling Systems

 

Call 248-388-3525