TIGER CREEK GENERATION FACILITY

Completed Projects

The following project is illustrative of work performed by Ultimate Corrosion Control for our diverse client base worldwide.

Project Index

> Waste Water Treatment - FGD System
>
Tiger Creek Generation Facility
> Mesquite Power Generation Facility
> Trimble County Generation Facility
> Electro-Coat Paint Tank Reline
> E-Coat Secondary Containment

Tiger Creek Generation Facility

Project Description. Approximately 128,000 square feet of surfaces was coated following preparation to SSPC-SP6 commercial Blast Cleaning and SSPC-SP3 Power Tool cleaning.

Surfaces received Corrosion Protection:

  • Bolted Connection and Surfaces of Field Welds-Zinc Inhibiting Epoxy

  • Stacks - Silicon Aluminum Coating

  • Structural Steel and Equipment - Acrylic Latex

Work Performed:

  • Coatings: Exhaust Stocks, Turbine Enclosures, Air Filtration Systems

  • Painting: Equipment, Piping, Structural Steel

  • Architectural Finishes, Painting: Equipment, Piping, Structural Steel,
    Floor Coatings and Sealers, Caulking and Sealants, and Decorative Finishes

 